Windows Dry wall, paint, flooring, cabling. Stars & Stripes - So many classy views from the VNET Building Inside a 3rd floor office Drywall Heavy Lifting Made Easy Bruce Crane – This Business Was His Destiny Server Cabinets Server Cabinets - Keep Out! No mishaps if you can believe it. That's a lot of glass! Two of these are not server cabinets. Enter the Dragon Dale had to verify each and every cabinet to make sure we received what was ordered. This was no small task at this scale. HVAC Equipment – Going Up The top of the elevator shaft has been lowered. 4th Floor 4th Floor The building gets a fresh coat of paint on the east wall and bump out. 1st Coat of Blacktop Fiber vault on 11th Street. The Generator on top (tan), the fuel tank on the bottom (black). Dang! The paint has had time to set. Sheen is reduced. Future Welcome Area - Ground Floor The ceiling has been painted in the Data Center and the walls have a first coat of paint. Electrical Room Dry wall is almost complete. Window frames are in. Brad's Office Looking to the 4th Floor Curve (4th Floor) Joel's Office (Left) & Patio Subtle Curve of the Office Walls (left) Think this will work? Brad Wiertel Interested in finding out if VNET is a good fit for you? Contact Us