![](https://vnet.us/wp-content/uploads/TEB_0320.png)
Windows
![](https://vnet.us/wp-content/uploads/TEB_0326.png)
Dry wall, paint, flooring, cabling.
![](https://vnet.us/wp-content/uploads/TEB_0334.png)
Stars & Stripes - So many classy views from the VNET Building
![](https://vnet.us/wp-content/uploads/TEB_0336.png)
Inside a 3rd floor office
![](https://vnet.us/wp-content/uploads/TEB_0339.png)
Drywall
![](https://vnet.us/wp-content/uploads/TEB_0358.png)
Heavy Lifting Made Easy
![](https://vnet.us/wp-content/uploads/TEB_0416.png)
Bruce Crane – This Business Was His Destiny
![](https://vnet.us/wp-content/uploads/TEB_0426.png)
Server Cabinets
![](https://vnet.us/wp-content/uploads/TEB_0431.png)
Server Cabinets - Keep Out!
![](https://vnet.us/wp-content/uploads/TEB_0438.png)
![](https://vnet.us/wp-content/uploads/TEB_0454.png)
No mishaps if you can believe it.
![](https://vnet.us/wp-content/uploads/TEB_0455.png)
![](https://vnet.us/wp-content/uploads/TEB_0462.png)
That's a lot of glass!
![](https://vnet.us/wp-content/uploads/TEB_0480.png)
Two of these are not server cabinets.
![](https://vnet.us/wp-content/uploads/TEB_0490.png)
![](https://vnet.us/wp-content/uploads/TEB_0496.png)
Enter the Dragon
![](https://vnet.us/wp-content/uploads/TEB_0512.png)
Dale had to verify each and every cabinet to make sure we received what was ordered. This was no small task at this scale.
![](https://vnet.us/wp-content/uploads/TEB_0526.png)
HVAC Equipment – Going Up
![](https://vnet.us/wp-content/uploads/TEB_0546.png)
![](https://vnet.us/wp-content/uploads/TEB_0548.png)
The top of the elevator shaft has been lowered.
![](https://vnet.us/wp-content/uploads/TEB_0555.png)
4th Floor
![](https://vnet.us/wp-content/uploads/TEB_0558.png)
4th Floor
![](https://vnet.us/wp-content/uploads/TEB_0565.png)
The building gets a fresh coat of paint on the east wall and bump out.
![](https://vnet.us/wp-content/uploads/TEB_0579.png)
1st Coat of Blacktop
![](https://vnet.us/wp-content/uploads/TEB_0581.png)
Fiber vault on 11th Street.
![](https://vnet.us/wp-content/uploads/TEB_0582.png)
The Generator on top (tan), the fuel tank on the bottom (black). Dang!
![](https://vnet.us/wp-content/uploads/TEB_0596.png)
The paint has had time to set. Sheen is reduced.
![](https://vnet.us/wp-content/uploads/TEB_0600.png)
Future Welcome Area - Ground Floor
![](https://vnet.us/wp-content/uploads/TEB_0613.png)
The ceiling has been painted in the Data Center and the walls have a first coat of paint.
![](https://vnet.us/wp-content/uploads/TEB_0614.png)
Electrical Room
![](https://vnet.us/wp-content/uploads/TEB_0616.png)
Dry wall is almost complete. Window frames are in.
![](https://vnet.us/wp-content/uploads/TEB_0619.png)
Brad's Office
![](https://vnet.us/wp-content/uploads/TEB_0623.png)
Looking to the 4th Floor
![](https://vnet.us/wp-content/uploads/TEB_0626.png)
Curve (4th Floor)
![](https://vnet.us/wp-content/uploads/TEB_0627.png)
Interested in finding out if VNET is a good fit for you?
Contact Us