No need to shout. Manje Erie Studio Drone (10th Street) Stained Glass will be removed soon. Dale looks B.A. That steel will not support the data center. The entire floor of the future data center will be cut out and replaced. Looks pretty sketch here, but not for long. Framing for offices, staging area, restrooms are on the right. Voice team area is located in area by the windows. Immediate left is the data center. Early shot of the fourth floor before framing began. North windows and facade have been removed. IT floor. 2nd Floor On the immediate right are the restrooms. Each floor has an identical set of male and female restrooms. South Side This is the future home of a stair way that goes from 1-4. Super strong floor framing with new i-beams underneath will eventually have concrete poured on top. Horizontal pieces attached to the studs are specially designed to minimize vibration to help deaden the sounds through the offices. The fronts of the offices will be glass. Another view up through the floors. COO & Foreman We're having Manje Erie Studio put together a video about our building process. Matt and Brad were interviewed for the project. Data Center Floor – A view looking south. Dale inspects the progress of the data center. Manje Erie Studio start off their project with a drone flight to record the exterior of the building. Interested in finding out if VNET is a good fit for you? Contact Us