![](https://vnet.us/wp-content/uploads/TEB_7782.jpg)
No need to shout.
![](https://vnet.us/wp-content/uploads/TEB_7784.jpg)
Manje Erie Studio Drone (10th Street)
![](https://vnet.us/wp-content/uploads/dale-stairs.jpg)
Stained Glass will be removed soon. Dale looks B.A.
![](https://vnet.us/wp-content/uploads/TEB_7984.jpg)
That steel will not support the data center. The entire floor of the future data center will be cut out and replaced.
![](https://vnet.us/wp-content/uploads/TEB_5087.jpg)
Looks pretty sketch here, but not for long.
![](https://vnet.us/wp-content/uploads/TEB_7979.jpg)
Framing for offices, staging area, restrooms are on the right. Voice team area is located in area by the windows. Immediate left is the data center.
![](https://vnet.us/wp-content/uploads/TEB_7989.jpg)
Early shot of the fourth floor before framing began. North windows and facade have been removed.
![](https://vnet.us/wp-content/uploads/TEB_7986.jpg)
IT floor.
![](https://vnet.us/wp-content/uploads/TEB_7995.jpg)
2nd Floor
![](https://vnet.us/wp-content/uploads/TEB_7992.jpg)
On the immediate right are the restrooms. Each floor has an identical set of male and female restrooms.
![](https://vnet.us/wp-content/uploads/TEB_7772.jpg)
South Side
![](https://vnet.us/wp-content/uploads/IMG_7558.jpg)
This is the future home of a stair way that goes from 1-4.
![](https://vnet.us/wp-content/uploads/IMG_7549.jpg)
Super strong floor framing with new i-beams underneath will eventually have concrete poured on top.
![](https://vnet.us/wp-content/uploads/IMG_7554.jpg)
Horizontal pieces attached to the studs are specially designed to minimize vibration to help deaden the sounds through the offices. The fronts of the offices will be glass.
![](https://vnet.us/wp-content/uploads/IMG_7561.jpg)
Another view up through the floors.