Rothrock / VNET Building Construction Updates
-
VNET Building – Aug/Sept 2018
The server room was completed. A custom middle staircase was installed on-site to connect the four floors. HVAC system installed…
-
VNET Building – Summer 2018
The steel construction was completed and the windows installed for most of the building. New concrete was poured around the…
-
VNET Building – Spring 2018
The front of the building was deconstructed to prepare for the “bump-out” that was designed to expand the building north.
-
VNET Building – Winter 2018
2nd floor demo and floor replacement to accommodate the new server room. Interior framing nearly complete on 1st, 2nd, and…
-
VNET Building – Fall 2017
The Rothrock building as it looked at the time of purchase in the fall of 2017.